日本一区二区在线播放|日韩在线播放欧美字幕|n欧美国产国产综合视频|中文字幕无码毛片免费看|亚洲线上看久久久av中文|亚州精品自在线拍视频播放|理论片午夜伦夜理片2021|亚洲精品tv久久久久久久久久

欄目導(dǎo)航
聯(lián)系我們

手機(jī):13315253330

電話:0312-7512212

聯(lián)系人:王經(jīng)理

網(wǎng)址:579ms.com

地址:河北省保定市競(jìng)秀區(qū)樂(lè)凱北大街愛(ài)迪硅谷產(chǎn)業(yè)園

新聞動(dòng)態(tài) 當(dāng)前位置:首頁(yè)>新聞動(dòng)態(tài)>新聞動(dòng)態(tài)

空壓機(jī)的通風(fēng)系統(tǒng)在投運(yùn)初期出現(xiàn)排氣溫度

網(wǎng)址:579ms.com  2023-05-26  作者:admin    閱讀:

正確安裝壓縮機(jī)才能保證壓縮機(jī)按設(shè)計(jì)參數(shù)工作, 如安裝不正確, 將導(dǎo)致壓縮機(jī)排氣溫度高、振動(dòng)大、聲音異常等一系列問(wèn)題。首先將空壓機(jī)安裝在牢固的地面上, 設(shè)備基礎(chǔ)采用C20混凝土現(xiàn)澆。在空壓機(jī)廠房每個(gè)空壓機(jī)進(jìn)氣柵所對(duì)的墻壁上標(biāo)高為016m處分別安裝兩個(gè)軸流風(fēng)機(jī), 進(jìn)氣柵的空氣流速不超過(guò)015m / s, 且設(shè)計(jì)進(jìn)氣軸流風(fēng)機(jī)的通風(fēng)量與壓縮機(jī)風(fēng)扇的風(fēng)量相吻合, 保證了通風(fēng)系統(tǒng)的通暢。為確保冷卻風(fēng)道中空氣的壓降不超過(guò)30Pa, 設(shè)計(jì)時(shí)要保證從壓縮機(jī)出口排風(fēng)管道截面積是空壓機(jī)頂部截面積的2~3倍。且此通風(fēng)管道沒(méi)有縮頸。對(duì)其它機(jī)型螺桿壓縮機(jī), 如冷卻風(fēng)道中空氣的壓降超橡膠托輥 槽型托輥 皮帶托輥 平行托輥 保定搬家 保定搬家電話 保定搬家公司 保定搬家 銅鼎 銅獅子 過(guò)30Pa, 應(yīng)在冷卻風(fēng)道的出口安裝通風(fēng)風(fēng)扇, 才能保證壓縮機(jī)出口溫度控制在正常范圍內(nèi)。空壓機(jī)的通風(fēng)系統(tǒng)在投運(yùn)初期出現(xiàn)排氣溫度高達(dá)108℃的現(xiàn)象, 經(jīng)查找原因分析, 是因?yàn)樵谖逶路菘諝庵械臉?shù)型槽模具 一次性止血帶 保定水處理設(shè)備 一次性止血帶 保定空壓機(jī) 北京真空泵毛比較多, 堵塞了板翅式換熱器, 影響了出口氣的換熱效果。為防止樹(shù)毛堵塞板翅式換熱器, 在兩個(gè)軸流風(fēng)機(jī)的入口分別加裝60目的不銹鋼網(wǎng), 效果十分明顯。另外,在以后的運(yùn)行過(guò)程中, 做到定期吹掃板翅式換熱器, 以后再?zèng)]有出現(xiàn)排氣溫度高的現(xiàn)象。
The correct installation of the compressor can ensure that it operates according to the design parameters. If not installed correctly, it will lead to a series of problems such as high exhaust temperature, high vibration, and abnormal sound of the compressor. Firstly, install the air compressor on a solid ground, and the equipment foundation is cast-in-place with C20 concrete. Two axial flow fans are installed at an elevation of 016m on the wall opposite each air compressor intake grille in the air compressor plant. The air flow rate of the intake grille does not exceed 015m/s, and the designed ventilation volume of the intake axial flow fan matches the air volume of the compressor fan, ensuring the smoothness of the ventilation system. To ensure that the pressure drop of the air in the cooling air duct does not exceed 30Pa, the design should ensure that the cross-sectional area of the exhaust duct from the compressor outlet is 2-3 times that of the top cross-sectional area of the air compressor. And this ventilation duct has no necking. For other types of screw compressors, such as the air pressure drop in the cooling air duct exceeding that of rubber rollers, grooved rollers, belt rollers, parallel rollers, Baoding movers, Baoding movers, Baoding movers, Baoding movers, Baoding movers, and copper lions, which exceed 30Pa, a ventilation fan should be installed at the outlet of the cooling air duct to ensure that the compressor outlet temperature is controlled within the normal range. The ventilation system of the air compressor experienced a phenomenon of exhaust temperature as high as 108 ℃ in the early stage of operation. After investigation and analysis, it was found that there were many tree hairs in the air in May, which blocked the plate fin heat exchanger and affected the heat exchange effect of the outlet gas. To prevent tree hairs from blocking the plate fin heat exchanger, 60 mesh stainless steel mesh was installed at the inlet of the two axial flow fans, which has a very obvious effect. In addition, in the future operation process, the plate-fin heat exchanger should be regularly purged, and there should be no phenomenon of high exhaust temperature in the future.

返回新聞


平山县| 徐闻县| 开封县| 措勤县| 廊坊市| 乌兰浩特市| 兴国县| 克拉玛依市| 沙湾县| 遵义县| 宜丰县| 醴陵市| 绥江县| 马尔康县| 南郑县| 屏东市| 左云县| 论坛| 翁源县| 周宁县| 兖州市| 盐城市| 黄平县| 乌苏市| 新河县| 漠河县| 特克斯县| 怀仁县| 碌曲县| 宁南县| 建始县| 民权县| 长治县| 拉萨市| 铜梁县| 石嘴山市| 房产| 桓仁| 甘谷县| 临桂县| 嘉禾县|